Project Description

This project included mass excavation/grading, base rock installation and grading, paving and striping for the new parking lot in front of new building addition.  Project also included asphalt re-surfacing of North Harrison campus primary roadway.  Demolition of existing concrete island near the North Harrison Middle School entrance.  Crack filling, seal coating and re-striping of all parking lots as well as the ball field path at the North Harrison campus.  Crack filling, seal coating of all three lots at Morgan Elementary.

Project Details

  • Client: North Harrison Community Schools
  • Architect/Engineer: Kovert Hawkins Architects, Inc.
  • Construction Manager: James L. Shireman, Inc.
  • Builder/General Contractor: APC
  • Budget: $337,700
  • Expected Start and Finish Dates: July – November 2018

Project Gallery

IMG_1566
IMG_1567
IMG_1571
IMG_1573
IMG_1595
IMG_1598
IMG_1584
IMG_1583
IMG_1585
IMG_1587
IMG_1586
IMG_1604
IMG_1605
IMG_1606
IMG_1607
IMG_1574
1
2
8
3
Read More
4Sep

M. Fine Lot Development

M. Fine Lot Development

finished

Project Description

This project consisted of excavating and grading the existing topography to install a new parking lot. APC began by installing a compacted stone base for the new parking lot and the alley way behind the parking lot. An electrical conduit and concrete base for new lighting poles were installed, as well as drainage structures and drainage pipe. Some of the existing sidewalk was removed and replaced with new ADA compliant crosswalks. A concrete privacy wall with decorative limestone veneer was built along the perimeter of the lot facing Main Street. A wooden privacy fence was built along the remaining perimeter. APC installed an HMA Base course and HMA Surface course along with monolithic concrete curb and gutter around the lot. APC added signs and striping to complete construction of the lot.

Project Details

  • Client: New Albany Board of Public Works
  • Architect/Engineer: HMB Professional Engineers, Inc.
  • Builder/General Contractor: APC
  • Expected Start and Finish Dates: June – September 2018

Project Gallery

IMG_1285
IMG_1286
IMG_1287
IMG_1288
grade work
grade work 2
IMG_1609
IMG_1611
IMG_1613
IMG_1617
IMG_1616
IMG_1626
IMG_1625
IMG_1621
IMG_1632
IMG_1634
IMG_1639
IMG_1649
IMG_1652
IMG_1665
IMG_1677
IMG_1679
IMG_2121
IMG_1683
IMG_2126
IMG_2128
IMG_2141
IMG_2149
Read More
27Jul

Wesley Chapel, Seal-coat/Striping

Wesley Chapel Parking Lot Seal-coating and Striping

IMG_1504

Project Description

This project consisted of prepping the existing asphalt to apply rubber crack sealant to cracks throughout the parking lot and drive. APC then applied a seal coating to the entire parking lot and drive and re-striped the entire parking lot and drive to original design. APC installed a 6″ PVC French drain wrapped in Geo-textile fabric to eliminate drainage issue in the SE corner in the rear of the parking lot; as well as repairing the existing asphalt in this area.

Project Details

  • Client: Wesley Chapel
  • Architect/Engineer:
  • Builder/General Contractor: Allterrain Paving & Construction (APC)
  • Budget: N/A
  • Expected Start and Finish Dates: July 16 – July 26, 2018

Project Gallery

IMG_1489
IMG_1491
IMG_1495
IMG_1498
IMG_1505
IMG_1509
IMG_1513
IMG_1522
IMG_1526
IMG_1530
IMG_1532
IMG_1533
IMG_1534
IMG_1536
IMG_1538
IMG_1540
IMG_1541
IMG_1542
IMG_1545
IMG_1549
Read More
17Jul

Wyandotte Park, Sport Court Improvements

Wyandotte Park, Sport Court Improvements

IMG_1447

Project Description

This project consisted of demolishing the existing tennis court to replace it with a new futsal court, pickle ball courts and a tennis court. The existing lighting was removed and we installed new lighting for the new courts and the basketball court.  Allterrain regraded multiple areas within the park to improve storm drainage and installed new storm structures and a drain pipe. Allterrain also repaved majority of the existing walking paths within the park.

Project Details

  • Client: Louisville Jefferson County Metro Government/Metro Parks
  • Architect/Engineer: Louisville Jefferson County Metro Government/Metro Parks
  • Builder/General Contractor: Allterrain Paving & Construction (APC)
  • Budget: $303,000
  • Expected Start and Finish Dates: April – July 2018

Project Gallery

IMG_0901
IMG_0903
IMG_0904
IMG_0921
IMG_0906
IMG_0915
IMG_0910
IMG_0912
IMG_1173
IMG_0919
IMG_0922
IMG_1353
IMG_1169
IMG_0995
IMG_0986
IMG_2819
IMG_1176
IMG_1198
IMG_1201
IMG_7042
IMG_1347
IMG_1351
IMG_1349
IMG_1352
IMG_1476
IMG_1477
IMG_1470
IMG_1468
IMG_1472
IMG_1469
IMG_1457
IMG_1478
IMG_1467
IMG_1466
IMG_1461
IMG_1463
IMG_1447
IMG_1449
IMG_1444
IMG_1441
IMG_1452
IMG_1455
IMG_1443
IMG_1442
Read More
10Jul

Chadford Way, D.I.P

Chadford Way, Drainage Improvement Project

IMG_1303

Project Description

This project consists of earth regrading and building a concrete wall due to flooding issues. We also replaced the affected neighbors driveway and added stone and sod to complete the curb appeal after the job was completed.

Project Details

  • Client: MSD
  • Architect/Engineer: Trautwein Engineering
  • Builder/General Contractor: APC
  • Budget: $200,000
  • Expected Start and Finish Dates: March – May 2018

Project Gallery

IMG_6555
IMG_6556
IMG_6558
IMG_6561
IMG_6563
IMG_6564
IMG_6566
IMG_6592
IMG_6597
IMG_6593
IMG_6711
IMG_6719
IMG_1299
IMG_1301
IMG_1304
IMG_1302
IMG_1305
IMG_1303
IMG_1306
IMG_1307
Read More
1Nov

Woodside Drive, D.I.P

Woodside Drive, Culvert Replacement D.I.P

IMG_0732

Project Description

This project consists of removing the existing road and concrete bridge. We are installing a 10’ x 5’ precast concrete box culvert and pouring in place concrete wing-walls and footers. We will then proceed with replacing the road with new asphalt and a guardrail.

Project Details

  • Client: Louisville Metro Public Works
  • Architect/Engineer: QK4
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: November 1st – November 15th 2017

Project Gallery

IMG_0723
IMG_0728
IMG_0730
IMG_0731
IMG_0735
IMG_0739
IMG_0747
IMG_0776
IMG_0790
IMG_0819
IMG_0821
IMG_0828
IMG_0827
IMG_0848
IMG_0843
IMG_0836
IMG_1150
IMG_1153
IMG_1155
IMG_1164
Read More
1Nov

Russel Lee Park, Sidewalk Replacement

Russel Lee Park, Sidewalk Replacement

IMG_0712

Project Description

This project consists of excavating the existing walkways and replacing them with a newly stamped concrete walking path, bench pads and site furnishings.

Project Details

  • Client: Metro Parks & Recreation
  • Architect/Engineer: Metro Parks & Recreation
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: November 2nd – December 2nd, 2017

Project Gallery

IMG_0701
IMG_0707
IMG_0702
IMG_0703
IMG_0793
IMG_0799
IMG_0798
IMG_0804
IMG_1213
IMG_1214
IMG_1222
IMG_1216
IMG_1218
IMG_1219
IMG_1220
IMG_1221
Read More
17Aug

Vincennes St, Thermoplastic Striping

Vincennes St, Thermoplastic Striping

IMG_0246

Project Description

This project consists of thermoplastic striping and road markings along Vincennes St from Main St to Charlestown Rd. We striped all new asphalt including traffic symbols, parking spots, cross walks and bike lanes.

Project Details

  • Client: City of New Albany
  • Architect/Engineer: Clark Dietz Inc, Wes Christmas
  • Builder/General Contractor: MAC Construction & Excavating Inc
  • Budget: N/A
  • Expected Start and Finish Dates: July 11 2017 – August 31 2017

Project Gallery

IMG_0237
IMG_0241
IMG_0242
IMG_0258
IMG_0266
IMG_0267
IMG_0271
IMG_0281
IMG_0290
IMG_0294
IMG_0296
IMG_0298
IMG_0302
IMG_0303
IMG_0305
IMG_0508
Read More
1Aug

Hopkins Lane, Sidewalk & D.I.P

Hopkins Lane Sidewalk Installation and Storm Drainage Improvments

IMG_6391

Project Description

This project consists of the furnishing and installing approximately 3,900’ of 5’ wide concrete sidewalk, curb ramps, concrete driveway aprons, selective paving, striping, storm and sanitary sewers.

Project Details

  • Client: City of Jeffersonville
  • Architect/Engineer: Jacobi, Toombs &Lanz Inc.
  • Builder/General Contractor: APC
  • Budget: $315,000
  • Expected Start and Finish Dates: June 2017 to August 2017

Project Gallery

IMG_6393
IMG_6399
IMG_6405
IMG_6408
IMG_6409
IMG_6411 (2)
IMG_6414
IMG_6420
IMG_6421
IMG_6424
IMG_6427
IMG_6428
IMG_6429
IMG_6430
IMG_0500
IMG_0502
IMG_0499
IMG_0448
IMG_0452
IMG_0464
IMG_0467
IMG_0469
IMG_0482
IMG_0489
IMG_0492
IMG_0457
IMG_0459
Read More
14Jul

N.A Plaza, Concrete/Asphalt/Striping

New Albany Plaza, Concrete Curbs/Paving/Striping

IMG_0217

Project Description

This project consists of milling the vast majority of the parking lot to install new concrete curbs and pour new asphalt. We also striped all new asphalt and painted traffic control and handicap symbols.

Project Details

  • Client: Kroger
  • Architect/Engineer: Heritage Engineering
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: June 22nd 2017 to July 14th 2017

Project Gallery

IMG_0195
IMG_0197
IMG_0199
IMG_0205
IMG_0209
IMG_0219
IMG_0221
IMG_0222
IMG_0226
IMG_0229
IMG_0233
IMG_0365
IMG_0388
IMG_0376
IMG_0306
IMG_0308
IMG_0310
IMG_0335
IMG_0325
IMG_0311
IMG_0355
IMG_0349
IMG_0348
IMG_0354
Read More
  • 1
  • 2