Woodside Drive, Culvert Replacement D.I.P

IMG_0732

Project Description

This project consists of removing the existing road and concrete bridge. We are installing a 10’ x 5’ precast concrete box culvert and pouring in place concrete wing-walls and footers. We will then proceed with replacing the road with new asphalt and a guardrail.

Project Details

  • Client: Louisville Metro Public Works
  • Architect/Engineer: QK4
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: November 1st – November 15th 2017

Project Gallery

IMG_0723
IMG_0728
IMG_0730
IMG_0731
IMG_0735
IMG_0739
IMG_0747
IMG_0776
IMG_0790
IMG_0819
IMG_0821
IMG_0828
IMG_0827
IMG_0848
IMG_0843
IMG_0836
IMG_1150
IMG_1153
IMG_1155
IMG_1164