21Jun

Tycoon Way, D.I.P

Tycoon Way, D.I.P

IMG_0313

Project Description

For this drainage improvement project we began with clearing and excavating the existing broken down drainage ditch to install a new 6” wide concrete paved ‘V’ ditch. We are currently in the process of installing a new 12’ tall RediRock modular retaining wall system to repair the bank of the south fork of Beargrass Creek adjacent to Trevilian Way.

Project Details

  • Client:Louisville Metropolitan Sewer District
  • Architect/Engineer: Louisville Metropolitan Sewer District
  • Builder/General Contractor: APC
  • Budget: $200,000
  • Expected Start and Finish Dates: May 2017 (Expected) July 2017

Project Gallery

20170522_ (3)
20170522_ (5)
20170522_ (8)
20170522_9
IMG_0313
IMG_0314
IMG_0315
IMG_0316
IMG_0317
IMG_0318
Read More
21Jun

Progress Way, Asphalt Pavement Repair

Progress Way, Asphalt Pavement Repair

IMG_6157 (1)

Project Description

For this project we were sent in to fix the uneven and rough transition concerning where the roadway and the bridge meet. This transition had sunken over time which caused the roadway to be uncomfortable and unsafe for drivers. We were able to complete repairs on both ends of the bridge in 1 day causing minimal disruption to traffic flow on this busy roadway. For this project we used our Infrared Asphalt Recycler Machine, therefore there was no need of milling. With this technology we heated the existing asphalt back up to factory standards, and then we add rejuvenating oil, which brought the asphalt back to life. At this point we were able to rake the asphalt to properly distribute it, and at that time the asphalt is rolled and sealed to create a smooth and long lasting surface.

Project Details

  • Client: Town of Clarksville
  • Architect/Engineer: Bradley Cummings- Public Works Director
  • Builder/General Contractor: APC
  • Budget: $5000
  • Expected Start and Finish Dates:Started & Completed on June 1st2017

Project Gallery

IMG_6160 (2)
IMG_6157 (1)
IMG_6156
IMG_6178
IMG_6172
IMG_6179 (1)
IMG_6200
Read More
21Jun

C2 Event Center, Site Demo & Lot Remodel

C2 Event Center, Site Demo & Lot Remodel

IMG_6362 (2)

Project Description

For this project we performed selective construction and site demo for a new building/event center. The project consisted of sitegrading for building pad, installing irrigation sleeves, sidewalks, curbs, curb ramps, driveway/entrance, wheel stops, signage, asphalt parking lot repairs, sealcoat, and striping.

Project Details

  • Client: Kelley Construction
  • Architect/Engineer:
  • Builder/General Contractor: Kelley Construction (General contractor) APC (Subcontractor)
  • Budget: $176,000
  • Expected Start and Finish Dates: April 2016 to June 2017

Project Gallery

IMG_6361 (2)
IMG_6362 (3)
IMG_6332
IMG_6335
IMG_6337
IMG_6338
IMG_6339
IMG_6347
IMG_6349
IMG_6350
IMG_6351
IMG_6356
IMG_6357
IMG_6358 (2)
IMG_6358
IMG_6359
IMG_6360 (2)
IMG_6361 (2)
IMG_6361

Project Video

Read More
21Jun

Little League Blvd, Asphalt Paving

Little League Blvd, Asphalt Paving

IMG_6258

Project Description

For this project we began with a full mill and overlay of the existing asphalt pavement.This road was approximately 1600’ long and 35’ wide. This project involved a significant amount of leveling and wedging to improve drainage and reliability of roadway. Within 3 days we completed the paving operations on both sides of the roadway.

Project Details

Client: Town of Clarksville
Architect/Engineer: Bradley Cummings
Builder/General Contractor: APC
Budget: $120,000
Expected Start and Finish Dates: June 5th to June 7th

Project Gallery

IMG_6245
IMG_6434
IMG_6432
IMG_6431

Project Video

Read More
20Jun

Chestnut Street, Streetscape

Chestnut Street, Streetscape

Chestnut St- Streetscape6

Project Description

This project included milling and repaving the existing asphalt pavement.We also removed and replaced the concrete sidewalks to redesign the street corner at Chestnut St and Wall St. We then created a curbed bump-out that swells out into the road to form a defined parking area for the nearby residents. This streetscape really enhanced the aesthetic and created a safe area for pedestrians and parked cars.

Project Details

  • Client: City of Jeffersonville
  • Architect/Engineer: City of Jeffersonville
  • Builder/General Contractor: APC
  • Budget: $45,000
  • Expected Start and Finish Dates: April 2017 to June 2017

Project Gallery

Chestnut St- Streetscape
Chestnut St- Streetscape2
Chestnut St- Streetscape3
Chestnut St- Streetscape4
Chestnut St- Streetscape5

Project Video

Read More
20Jun

Autumn Grove, Concrete Work & D.I.P

Autumn Grove, Concrete Work & D.I.P

IMG_6214

Project Description

For this new subdivision we have done all concrete work including driveways, walkways, sidewalks, stairs, curbs and gutters, and drain pans. We created a detention base to collect and properly drain overflow storm water. All of the roadways have been base paved by usand we will finish the paving process once all other construction on-site has finished, ensuring a long-lasting roadway.

Project Details

  • Client: Neace Ventures
  • Architect/Engineer: John G. Brinkworth
  • Builder/General Contractor: Neace Ventures
  • Budget: $250,000
  • Expected Start and Finish Dates: 2014  (Expected) Fall of 2018

Project Gallery

Automn Grove- Detention Base
IMG_6211
IMG_6212
IMG_6213
Read More
13Jun

Applegate Lane, D.I.P

Applegate Lane, D.I.P

20170608_143335

Project Description

The Town of Sellersburg had an emergency contract to replace a failing concrete drainage structure. For this drainage improvement project we began with excavating the existing breaking down roadway and old-style concrete culvert to install a brand new concrete box culvert. After excavating the site, we then regraded the drainage bank area to ensure proper water flow. The new culvert box is 10’ wide by 4’ tall and 60’ long. After placing the new culvert boxes we began to form and pour concrete wing walls on each end of the structure. We then added rip-rap stone base and paved a new roadway.

Project Details

  • Client: Town of Sellersburg
  • Architect/Engineer: Jacobi, Toombs & Lanz Inc.
  • Builder/General Contractor: APC
  • Budget: $120,000
  • Expected Start and Finish Dates: May 25th → June 13th 2017

Project Gallery

IMG_0321
IMG_6259
IMG_6261
IMG_0327
IMG_6268
IMG_0326
IMG_0322
IMG_0325
IMG_0329
20170608_143453
20170608_143413
20170608_143335
IMG_6373
IMG_6363
IMG_6369
IMG_6368
IMG_6386
IMG_6375
IMG_6385
IMG_6376
IMG_6388

Project Video

Read More
21May

Premier Homes, Domestic Water Main Installation

Premier Homes, Domestic Water Main Installation

Project Description

For this project we installed new domestic water lines with individual property service connections for a new subdivision development in Louisville, KY.

Project Details

  • Client: Premier Homes
  • Architect/Engineer: Louisville Water Company
  • Builder/General Contractor: APC
  • Budget: $25,000
  • Expected Start and Finish Dates: Completed Dec 2016

Project Gallery

Premier Homes3
Premier Homes
IMG_0238
Read More
21May

Ground Effects LTD., New Parking Lot

Ground Effects LTD., New Parking Lot

Project Description

For this project APC was responsible for a full site development for Ford’s production lot of 10,000 square yards. We began with excavating the site and leveling out the ground. Once we had an even surface we placed and compressed the rip-rap stone base to prepare for asphalt paving. APC performed the asphalt paving and striping of the new lot as well.

Project Details

  • Client: Ground Effects LTD.
  • Architect/Engineer: APC
  • Builder/General Contractor: APC
  • Budget: $90,000
  • Expected Start and Finish Dates: November 2016 to December 2016

Project Gallery

IMG_1355 (1)
IMG_1357 - Copy (2)
IMG_1361 - Copy
IMG_1372
IMG_1375
IMG_1385
IMG_1389
IMG_1407
Read More
21May

LG&E Restoration Contract

LG&E Restoration Contract

20161031_090405_resized_1

Project Description

APC is responsible for repairing the disturbed areas of all roadways, concrete street pads and sidewalks where LG&E has completed the renewal of gas pipe work. This restoration contract that LG&E is performing takes place within the downtown metro area of Louisville, KY. So far, APC has completed 13 projects for this contract.

Project Details

  • Client: LG&E
  • Architect/Engineer: David McQuire and Debra Davis from LG&E
  • Builder/General Contractor: APC
  • Budget: Unit Price Contract
  • Expected Start and Finish Dates: Contract finishes in April 2021

Project Gallery

20161031_090413_resized_1
20161031_090500_resized_1
20161031_090507_resized_1
20161031_090519_resized_1
Paving Crew
Read More