Project Description

This project consists of earth regrading and building a concrete wall due to flooding issues. We also replaced the affected neighbors driveway and added stone and sod to complete the curb appeal after the job was completed.

Project Details

  • Client: MSD
  • Architect/Engineer: Trautwein Engineering
  • Builder/General Contractor: APC
  • Budget: $200,000
  • Expected Start and Finish Dates: March – May 2018

Project Gallery

IMG_6555
IMG_6556
IMG_6558
IMG_6561
IMG_6563
IMG_6564
IMG_6566
IMG_6592
IMG_6597
IMG_6593
IMG_6711
IMG_6719
IMG_1299
IMG_1301
IMG_1304
IMG_1302
IMG_1305
IMG_1303
IMG_1306
IMG_1307
Read More
13Jun

Applegate Lane, D.I.P

Applegate Lane, D.I.P

20170608_143335

Project Description

The Town of Sellersburg had an emergency contract to replace a failing concrete drainage structure. For this drainage improvement project we began with excavating the existing breaking down roadway and old-style concrete culvert to install a brand new concrete box culvert. After excavating the site, we then regraded the drainage bank area to ensure proper water flow. The new culvert box is 10’ wide by 4’ tall and 60’ long. After placing the new culvert boxes we began to form and pour concrete wing walls on each end of the structure. We then added rip-rap stone base and paved a new roadway.

Project Details

  • Client: Town of Sellersburg
  • Architect/Engineer: Jacobi, Toombs & Lanz Inc.
  • Builder/General Contractor: APC
  • Budget: $120,000
  • Expected Start and Finish Dates: May 25th → June 13th 2017

Project Gallery

IMG_0321
IMG_6259
IMG_6261
IMG_0327
IMG_6268
IMG_0326
IMG_0322
IMG_0325
IMG_0329
20170608_143453
20170608_143413
20170608_143335
IMG_6373
IMG_6363
IMG_6369
IMG_6368
IMG_6386
IMG_6375
IMG_6385
IMG_6376
IMG_6388

Project Video

Read More