4Sep

M. Fine Lot Development

M. Fine Lot Development

finished

Project Description

This project consisted of excavating and grading the existing topography to install a new parking lot. APC began by installing a compacted stone base for the new parking lot and the alley way behind the parking lot. An electrical conduit and concrete base for new lighting poles were installed, as well as drainage structures and drainage pipe. Some of the existing sidewalk was removed and replaced with new ADA compliant crosswalks. A concrete privacy wall with decorative limestone veneer was built along the perimeter of the lot facing Main Street. A wooden privacy fence was built along the remaining perimeter. APC installed an HMA Base course and HMA Surface course along with monolithic concrete curb and gutter around the lot. APC added signs and striping to complete construction of the lot.

Project Details

  • Client: New Albany Board of Public Works
  • Architect/Engineer: HMB Professional Engineers, Inc.
  • Builder/General Contractor: APC
  • Expected Start and Finish Dates: June – September 2018

Project Gallery

IMG_1285
IMG_1286
IMG_1287
IMG_1288
grade work
grade work 2
IMG_1609
IMG_1611
IMG_1613
IMG_1617
IMG_1616
IMG_1626
IMG_1625
IMG_1621
IMG_1632
IMG_1634
IMG_1639
IMG_1649
IMG_1652
IMG_1665
IMG_1677
IMG_1679
IMG_2121
IMG_1683
IMG_2126
IMG_2128
IMG_2141
IMG_2149
Read More
1Aug

Hopkins Lane, Sidewalk & D.I.P

Hopkins Lane Sidewalk Installation and Storm Drainage Improvments

IMG_6391

Project Description

This project consists of the furnishing and installing approximately 3,900’ of 5’ wide concrete sidewalk, curb ramps, concrete driveway aprons, selective paving, striping, storm and sanitary sewers.

Project Details

  • Client: City of Jeffersonville
  • Architect/Engineer: Jacobi, Toombs &Lanz Inc.
  • Builder/General Contractor: APC
  • Budget: $315,000
  • Expected Start and Finish Dates: June 2017 to August 2017

Project Gallery

IMG_6393
IMG_6399
IMG_6405
IMG_6408
IMG_6409
IMG_6411 (2)
IMG_6414
IMG_6420
IMG_6421
IMG_6424
IMG_6427
IMG_6428
IMG_6429
IMG_6430
IMG_0500
IMG_0502
IMG_0499
IMG_0448
IMG_0452
IMG_0464
IMG_0467
IMG_0469
IMG_0482
IMG_0489
IMG_0492
IMG_0457
IMG_0459
Read More
14Jul

N.A Plaza, Concrete/Asphalt/Striping

New Albany Plaza, Concrete Curbs/Paving/Striping

IMG_0217

Project Description

This project consists of milling the vast majority of the parking lot to install new concrete curbs and pour new asphalt. We also striped all new asphalt and painted traffic control and handicap symbols.

Project Details

  • Client: Kroger
  • Architect/Engineer: Heritage Engineering
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: June 22nd 2017 to July 14th 2017

Project Gallery

IMG_0195
IMG_0197
IMG_0199
IMG_0205
IMG_0209
IMG_0219
IMG_0221
IMG_0222
IMG_0226
IMG_0229
IMG_0233
IMG_0365
IMG_0388
IMG_0376
IMG_0306
IMG_0308
IMG_0310
IMG_0335
IMG_0325
IMG_0311
IMG_0355
IMG_0349
IMG_0348
IMG_0354
Read More
20Jun

Chestnut Street, Streetscape

Chestnut Street, Streetscape

Chestnut St- Streetscape6

Project Description

This project included milling and repaving the existing asphalt pavement.We also removed and replaced the concrete sidewalks to redesign the street corner at Chestnut St and Wall St. We then created a curbed bump-out that swells out into the road to form a defined parking area for the nearby residents. This streetscape really enhanced the aesthetic and created a safe area for pedestrians and parked cars.

Project Details

  • Client: City of Jeffersonville
  • Architect/Engineer: City of Jeffersonville
  • Builder/General Contractor: APC
  • Budget: $45,000
  • Expected Start and Finish Dates: April 2017 to June 2017

Project Gallery

Chestnut St- Streetscape
Chestnut St- Streetscape2
Chestnut St- Streetscape3
Chestnut St- Streetscape4
Chestnut St- Streetscape5

Project Video

Read More
20Jun

Autumn Grove, Concrete Work & D.I.P

Autumn Grove, Concrete Work & D.I.P

IMG_6214

Project Description

For this new subdivision we have done all concrete work including driveways, walkways, sidewalks, stairs, curbs and gutters, and drain pans. We created a detention base to collect and properly drain overflow storm water. All of the roadways have been base paved by usand we will finish the paving process once all other construction on-site has finished, ensuring a long-lasting roadway.

Project Details

  • Client: Neace Ventures
  • Architect/Engineer: John G. Brinkworth
  • Builder/General Contractor: Neace Ventures
  • Budget: $250,000
  • Expected Start and Finish Dates: 2014  (Expected) Fall of 2018

Project Gallery

Automn Grove- Detention Base
IMG_6211
IMG_6212
IMG_6213
Read More
21May

LG&E Restoration Contract

LG&E Restoration Contract

20161031_090405_resized_1

Project Description

APC is responsible for repairing the disturbed areas of all roadways, concrete street pads and sidewalks where LG&E has completed the renewal of gas pipe work. This restoration contract that LG&E is performing takes place within the downtown metro area of Louisville, KY. So far, APC has completed 13 projects for this contract.

Project Details

  • Client: LG&E
  • Architect/Engineer: David McQuire and Debra Davis from LG&E
  • Builder/General Contractor: APC
  • Budget: Unit Price Contract
  • Expected Start and Finish Dates: Contract finishes in April 2021

Project Gallery

20161031_090413_resized_1
20161031_090500_resized_1
20161031_090507_resized_1
20161031_090519_resized_1
Paving Crew
Read More