M. Fine Lot Development

M. Fine Lot Development

finished

Project Description

This project consisted of excavating and grading the existing topography to install a new parking lot. APC began by installing a compacted stone base for the new parking lot and the alley way behind the parking lot. An electrical conduit and concrete base for new lighting poles were installed, as well as drainage structures and drainage pipe. Some of the existing sidewalk was removed and replaced with new ADA compliant crosswalks. A concrete privacy wall with decorative limestone veneer was built along the perimeter of the lot facing Main Street. A wooden privacy fence was built along the remaining perimeter. APC installed an HMA Base course and HMA Surface course along with monolithic concrete curb and gutter around the lot. APC added signs and striping to complete construction of the lot.

Project Details

  • Client: New Albany Board of Public Works
  • Architect/Engineer: HMB Professional Engineers, Inc.
  • Builder/General Contractor: APC
  • Expected Start and Finish Dates: June – September 2018

Project Gallery

IMG_1285
IMG_1286
IMG_1287
IMG_1288
grade work
grade work 2
IMG_1609
IMG_1611
IMG_1613
IMG_1617
IMG_1616
IMG_1626
IMG_1625
IMG_1621
IMG_1632
IMG_1634
IMG_1639
IMG_1649
IMG_1652
IMG_1665
IMG_1677
IMG_1679
IMG_2121
IMG_1683
IMG_2126
IMG_2128
IMG_2141
IMG_2149
Read More
14Jul

N.A Plaza, Concrete/Asphalt/Striping

New Albany Plaza, Concrete Curbs/Paving/Striping

IMG_0217

Project Description

This project consists of milling the vast majority of the parking lot to install new concrete curbs and pour new asphalt. We also striped all new asphalt and painted traffic control and handicap symbols.

Project Details

  • Client: Kroger
  • Architect/Engineer: Heritage Engineering
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: June 22nd 2017 to July 14th 2017

Project Gallery

IMG_0195
IMG_0197
IMG_0199
IMG_0205
IMG_0209
IMG_0219
IMG_0221
IMG_0222
IMG_0226
IMG_0229
IMG_0233
IMG_0365
IMG_0388
IMG_0376
IMG_0306
IMG_0308
IMG_0310
IMG_0335
IMG_0325
IMG_0311
IMG_0355
IMG_0349
IMG_0348
IMG_0354
Read More
21Jun

C2 Event Center, Site Demo & Lot Remodel

C2 Event Center, Site Demo & Lot Remodel

IMG_6362 (2)

Project Description

For this project we performed selective construction and site demo for a new building/event center. The project consisted of sitegrading for building pad, installing irrigation sleeves, sidewalks, curbs, curb ramps, driveway/entrance, wheel stops, signage, asphalt parking lot repairs, sealcoat, and striping.

Project Details

  • Client: Kelley Construction
  • Architect/Engineer:
  • Builder/General Contractor: Kelley Construction (General contractor) APC (Subcontractor)
  • Budget: $176,000
  • Expected Start and Finish Dates: April 2016 to June 2017

Project Gallery

IMG_6361 (2)
IMG_6362 (3)
IMG_6332
IMG_6335
IMG_6337
IMG_6338
IMG_6339
IMG_6347
IMG_6349
IMG_6350
IMG_6351
IMG_6356
IMG_6357
IMG_6358 (2)
IMG_6358
IMG_6359
IMG_6360 (2)
IMG_6361 (2)
IMG_6361

Project Video

Read More
20Jun

Chestnut Street, Streetscape

Chestnut Street, Streetscape

Chestnut St- Streetscape6

Project Description

This project included milling and repaving the existing asphalt pavement.We also removed and replaced the concrete sidewalks to redesign the street corner at Chestnut St and Wall St. We then created a curbed bump-out that swells out into the road to form a defined parking area for the nearby residents. This streetscape really enhanced the aesthetic and created a safe area for pedestrians and parked cars.

Project Details

  • Client: City of Jeffersonville
  • Architect/Engineer: City of Jeffersonville
  • Builder/General Contractor: APC
  • Budget: $45,000
  • Expected Start and Finish Dates: April 2017 to June 2017

Project Gallery

Chestnut St- Streetscape
Chestnut St- Streetscape2
Chestnut St- Streetscape3
Chestnut St- Streetscape4
Chestnut St- Streetscape5

Project Video

Read More