Project Description

This project included mass excavation/grading, base rock installation and grading, paving and striping for the new parking lot in front of new building addition.  Project also included asphalt re-surfacing of North Harrison campus primary roadway.  Demolition of existing concrete island near the North Harrison Middle School entrance.  Crack filling, seal coating and re-striping of all parking lots as well as the ball field path at the North Harrison campus.  Crack filling, seal coating of all three lots at Morgan Elementary.

Project Details

  • Client: North Harrison Community Schools
  • Architect/Engineer: Kovert Hawkins Architects, Inc.
  • Construction Manager: James L. Shireman, Inc.
  • Builder/General Contractor: APC
  • Budget: $337,700
  • Expected Start and Finish Dates: July – November 2018

Project Gallery

IMG_1566
IMG_1567
IMG_1571
IMG_1573
IMG_1595
IMG_1598
IMG_1584
IMG_1583
IMG_1585
IMG_1587
IMG_1586
IMG_1604
IMG_1605
IMG_1606
IMG_1607
IMG_1574
1
2
8
3
Read More
17Jul

Wyandotte Park, Sport Court Improvements

Wyandotte Park, Sport Court Improvements

IMG_1447

Project Description

This project consisted of demolishing the existing tennis court to replace it with a new futsal court, pickle ball courts and a tennis court. The existing lighting was removed and we installed new lighting for the new courts and the basketball court.  Allterrain regraded multiple areas within the park to improve storm drainage and installed new storm structures and a drain pipe. Allterrain also repaved majority of the existing walking paths within the park.

Project Details

  • Client: Louisville Jefferson County Metro Government/Metro Parks
  • Architect/Engineer: Louisville Jefferson County Metro Government/Metro Parks
  • Builder/General Contractor: Allterrain Paving & Construction (APC)
  • Budget: $303,000
  • Expected Start and Finish Dates: April – July 2018

Project Gallery

IMG_0901
IMG_0903
IMG_0904
IMG_0921
IMG_0906
IMG_0915
IMG_0910
IMG_0912
IMG_1173
IMG_0919
IMG_0922
IMG_1353
IMG_1169
IMG_0995
IMG_0986
IMG_2819
IMG_1176
IMG_1198
IMG_1201
IMG_7042
IMG_1347
IMG_1351
IMG_1349
IMG_1352
IMG_1476
IMG_1477
IMG_1470
IMG_1468
IMG_1472
IMG_1469
IMG_1457
IMG_1478
IMG_1467
IMG_1466
IMG_1461
IMG_1463
IMG_1447
IMG_1449
IMG_1444
IMG_1441
IMG_1452
IMG_1455
IMG_1443
IMG_1442
Read More
10Jul

Chadford Way, D.I.P

Chadford Way, Drainage Improvement Project

IMG_1303

Project Description

This project consists of earth regrading and building a concrete wall due to flooding issues. We also replaced the affected neighbors driveway and added stone and sod to complete the curb appeal after the job was completed.

Project Details

  • Client: MSD
  • Architect/Engineer: Trautwein Engineering
  • Builder/General Contractor: APC
  • Budget: $200,000
  • Expected Start and Finish Dates: March – May 2018

Project Gallery

IMG_6555
IMG_6556
IMG_6558
IMG_6561
IMG_6563
IMG_6564
IMG_6566
IMG_6592
IMG_6597
IMG_6593
IMG_6711
IMG_6719
IMG_1299
IMG_1301
IMG_1304
IMG_1302
IMG_1305
IMG_1303
IMG_1306
IMG_1307
Read More
14Jul

N.A Plaza, Concrete/Asphalt/Striping

New Albany Plaza, Concrete Curbs/Paving/Striping

IMG_0217

Project Description

This project consists of milling the vast majority of the parking lot to install new concrete curbs and pour new asphalt. We also striped all new asphalt and painted traffic control and handicap symbols.

Project Details

  • Client: Kroger
  • Architect/Engineer: Heritage Engineering
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: June 22nd 2017 to July 14th 2017

Project Gallery

IMG_0195
IMG_0197
IMG_0199
IMG_0205
IMG_0209
IMG_0219
IMG_0221
IMG_0222
IMG_0226
IMG_0229
IMG_0233
IMG_0365
IMG_0388
IMG_0376
IMG_0306
IMG_0308
IMG_0310
IMG_0335
IMG_0325
IMG_0311
IMG_0355
IMG_0349
IMG_0348
IMG_0354
Read More
21Jun

Little League Blvd, Asphalt Paving

Little League Blvd, Asphalt Paving

IMG_6258

Project Description

For this project we began with a full mill and overlay of the existing asphalt pavement.This road was approximately 1600’ long and 35’ wide. This project involved a significant amount of leveling and wedging to improve drainage and reliability of roadway. Within 3 days we completed the paving operations on both sides of the roadway.

Project Details

Client: Town of Clarksville
Architect/Engineer: Bradley Cummings
Builder/General Contractor: APC
Budget: $120,000
Expected Start and Finish Dates: June 5th to June 7th

Project Gallery

IMG_6245
IMG_6434
IMG_6432
IMG_6431

Project Video

Read More
20Jun

Chestnut Street, Streetscape

Chestnut Street, Streetscape

Chestnut St- Streetscape6

Project Description

This project included milling and repaving the existing asphalt pavement.We also removed and replaced the concrete sidewalks to redesign the street corner at Chestnut St and Wall St. We then created a curbed bump-out that swells out into the road to form a defined parking area for the nearby residents. This streetscape really enhanced the aesthetic and created a safe area for pedestrians and parked cars.

Project Details

  • Client: City of Jeffersonville
  • Architect/Engineer: City of Jeffersonville
  • Builder/General Contractor: APC
  • Budget: $45,000
  • Expected Start and Finish Dates: April 2017 to June 2017