North Harrison – Repave, Seal Coat, Stripe

North Harrison Community Schools - Repave, Seal Coat & Stripe

IMG_1577

Project Description

This project included mass excavation/grading, base rock installation and grading, paving and striping for the new parking lot in front of new building addition.  Project also included asphalt re-surfacing of North Harrison campus primary roadway.  Demolition of existing concrete island near the North Harrison Middle School entrance.  Crack filling, seal coating and re-striping of all parking lots as well as the ball field path at the North Harrison campus.  Crack filling, seal coating of all three lots at Morgan Elementary.

Project Details

  • Client: North Harrison Community Schools
  • Architect/Engineer: Kovert Hawkins Architects, Inc.
  • Construction Manager: James L. Shireman, Inc.
  • Builder/General Contractor: APC
  • Budget: $337,700
  • Expected Start and Finish Dates: July – November 2018

Project Gallery

IMG_1566
IMG_1567
IMG_1571
IMG_1573
IMG_1595
IMG_1598
IMG_1584
IMG_1583
IMG_1585
IMG_1587
IMG_1586
IMG_1604
IMG_1605
IMG_1606
IMG_1607
IMG_1574
1
2
8
3
Read More
4Sep

M. Fine Lot Development

M. Fine Lot Development

finished

Project Description

This project consisted of excavating and grading the existing topography to install a new parking lot. APC began by installing a compacted stone base for the new parking lot and the alley way behind the parking lot. An electrical conduit and concrete base for new lighting poles were installed, as well as drainage structures and drainage pipe. Some of the existing sidewalk was removed and replaced with new ADA compliant crosswalks. A concrete privacy wall with decorative limestone veneer was built along the perimeter of the lot facing Main Street. A wooden privacy fence was built along the remaining perimeter. APC installed an HMA Base course and HMA Surface course along with monolithic concrete curb and gutter around the lot. APC added signs and striping to complete construction of the lot.

Project Details

  • Client: New Albany Board of Public Works
  • Architect/Engineer: HMB Professional Engineers, Inc.
  • Builder/General Contractor: APC
  • Expected Start and Finish Dates: June – September 2018

Project Gallery

IMG_1285
IMG_1286
IMG_1287
IMG_1288
grade work
grade work 2
IMG_1609
IMG_1611
IMG_1613
IMG_1617
IMG_1616
IMG_1626
IMG_1625
IMG_1621
IMG_1632
IMG_1634
IMG_1639
IMG_1649
IMG_1652
IMG_1665
IMG_1677
IMG_1679
IMG_2121
IMG_1683
IMG_2126
IMG_2128
IMG_2141
IMG_2149
Read More
27Jul

Wesley Chapel, Seal-coat/Striping

Wesley Chapel Parking Lot Seal-coating and Striping

IMG_1504

Project Description

This project consisted of prepping the existing asphalt to apply rubber crack sealant to cracks throughout the parking lot and drive. APC then applied a seal coating to the entire parking lot and drive and re-striped the entire parking lot and drive to original design. APC installed a 6″ PVC French drain wrapped in Geo-textile fabric to eliminate drainage issue in the SE corner in the rear of the parking lot; as well as repairing the existing asphalt in this area.

Project Details

  • Client: Wesley Chapel
  • Architect/Engineer:
  • Builder/General Contractor: Allterrain Paving & Construction (APC)
  • Budget: N/A
  • Expected Start and Finish Dates: July 16 – July 26, 2018

Project Gallery

IMG_1489
IMG_1491
IMG_1495
IMG_1498
IMG_1505
IMG_1509
IMG_1513
IMG_1522
IMG_1526
IMG_1530
IMG_1532
IMG_1533
IMG_1534
IMG_1536
IMG_1538
IMG_1540
IMG_1541
IMG_1542
IMG_1545
IMG_1549
Read More
17Aug

Vincennes St, Thermoplastic Striping

Vincennes St, Thermoplastic Striping

IMG_0246

Project Description

This project consists of thermoplastic striping and road markings along Vincennes St from Main St to Charlestown Rd. We striped all new asphalt including traffic symbols, parking spots, cross walks and bike lanes.

Project Details

  • Client: City of New Albany
  • Architect/Engineer: Clark Dietz Inc, Wes Christmas
  • Builder/General Contractor: MAC Construction & Excavating Inc
  • Budget: N/A
  • Expected Start and Finish Dates: July 11 2017 – August 31 2017

Project Gallery

IMG_0237
IMG_0241
IMG_0242
IMG_0258
IMG_0266
IMG_0267
IMG_0271
IMG_0281
IMG_0290
IMG_0294
IMG_0296
IMG_0298
IMG_0302
IMG_0303
IMG_0305
IMG_0508
Read More
14Jul

N.A Plaza, Concrete/Asphalt/Striping

New Albany Plaza, Concrete Curbs/Paving/Striping

IMG_0217

Project Description

This project consists of milling the vast majority of the parking lot to install new concrete curbs and pour new asphalt. We also striped all new asphalt and painted traffic control and handicap symbols.

Project Details

  • Client: Kroger
  • Architect/Engineer: Heritage Engineering
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: June 22nd 2017 to July 14th 2017

Project Gallery

IMG_0195
IMG_0197
IMG_0199
IMG_0205
IMG_0209
IMG_0219
IMG_0221
IMG_0222
IMG_0226
IMG_0229
IMG_0233
IMG_0365
IMG_0388
IMG_0376
IMG_0306
IMG_0308
IMG_0310
IMG_0335
IMG_0325
IMG_0311
IMG_0355
IMG_0349
IMG_0348
IMG_0354
Read More
21Jun

C2 Event Center, Site Demo & Lot Remodel

C2 Event Center, Site Demo & Lot Remodel

IMG_6362 (2)

Project Description

For this project we performed selective construction and site demo for a new building/event center. The project consisted of sitegrading for building pad, installing irrigation sleeves, sidewalks, curbs, curb ramps, driveway/entrance, wheel stops, signage, asphalt parking lot repairs, sealcoat, and striping.

Project Details

  • Client: Kelley Construction
  • Architect/Engineer:
  • Builder/General Contractor: Kelley Construction (General contractor) APC (Subcontractor)
  • Budget: $176,000
  • Expected Start and Finish Dates: April 2016 to June 2017

Project Gallery

IMG_6361 (2)
IMG_6362 (3)
IMG_6332
IMG_6335
IMG_6337
IMG_6338
IMG_6339
IMG_6347
IMG_6349
IMG_6350
IMG_6351
IMG_6356
IMG_6357
IMG_6358 (2)
IMG_6358
IMG_6359
IMG_6360 (2)
IMG_6361 (2)
IMG_6361

Project Video

Read More
20Jun

Chestnut Street, Streetscape

Chestnut Street, Streetscape

Chestnut St- Streetscape6

Project Description

This project included milling and repaving the existing asphalt pavement.We also removed and replaced the concrete sidewalks to redesign the street corner at Chestnut St and Wall St. We then created a curbed bump-out that swells out into the road to form a defined parking area for the nearby residents. This streetscape really enhanced the aesthetic and created a safe area for pedestrians and parked cars.

Project Details

  • Client: City of Jeffersonville
  • Architect/Engineer: City of Jeffersonville
  • Builder/General Contractor: APC
  • Budget: $45,000
  • Expected Start and Finish Dates: April 2017 to June 2017