11Oct

North Harrison – Repave, Seal Coat, Stripe

North Harrison Community Schools - Repave, Seal Coat & Stripe

IMG_1577

Project Description

This project included mass excavation/grading, base rock installation and grading, paving and striping for the new parking lot in front of new building addition.  Project also included asphalt re-surfacing of North Harrison campus primary roadway.  Demolition of existing concrete island near the North Harrison Middle School entrance.  Crack filling, seal coating and re-striping of all parking lots as well as the ball field path at the North Harrison campus.  Crack filling, seal coating of all three lots at Morgan Elementary.

Project Details

  • Client: North Harrison Community Schools
  • Architect/Engineer: Kovert Hawkins Architects, Inc.
  • Construction Manager: James L. Shireman, Inc.
  • Builder/General Contractor: APC
  • Budget: $337,700
  • Expected Start and Finish Dates: July – November 2018

Project Gallery

IMG_1566
IMG_1567
IMG_1571
IMG_1573
IMG_1595
IMG_1598
IMG_1584
IMG_1583
IMG_1585
IMG_1587
IMG_1586
IMG_1604
IMG_1605
IMG_1606
IMG_1607
IMG_1574
1
2
8
3
Read More
21Jun

Progress Way, Asphalt Pavement Repair

Progress Way, Asphalt Pavement Repair

IMG_6157 (1)

Project Description

For this project we were sent in to fix the uneven and rough transition concerning where the roadway and the bridge meet. This transition had sunken over time which caused the roadway to be uncomfortable and unsafe for drivers. We were able to complete repairs on both ends of the bridge in 1 day causing minimal disruption to traffic flow on this busy roadway. For this project we used our Infrared Asphalt Recycler Machine, therefore there was no need of milling. With this technology we heated the existing asphalt back up to factory standards, and then we add rejuvenating oil, which brought the asphalt back to life. At this point we were able to rake the asphalt to properly distribute it, and at that time the asphalt is rolled and sealed to create a smooth and long lasting surface.

Project Details

  • Client: Town of Clarksville
  • Architect/Engineer: Bradley Cummings- Public Works Director
  • Builder/General Contractor: APC
  • Budget: $5000
  • Expected Start and Finish Dates:Started & Completed on June 1st2017

Project Gallery

IMG_6160 (2)
IMG_6157 (1)
IMG_6156
IMG_6178
IMG_6172
IMG_6179 (1)
IMG_6200
Read More
21May

LG&E Restoration Contract

LG&E Restoration Contract

20161031_090405_resized_1

Project Description

APC is responsible for repairing the disturbed areas of all roadways, concrete street pads and sidewalks where LG&E has completed the renewal of gas pipe work. This restoration contract that LG&E is performing takes place within the downtown metro area of Louisville, KY. So far, APC has completed 13 projects for this contract.

Project Details

  • Client: LG&E
  • Architect/Engineer: David McQuire and Debra Davis from LG&E
  • Builder/General Contractor: APC
  • Budget: Unit Price Contract
  • Expected Start and Finish Dates: Contract finishes in April 2021

Project Gallery

20161031_090413_resized_1
20161031_090500_resized_1
20161031_090507_resized_1
20161031_090519_resized_1
Paving Crew
Read More