4Sep

M. Fine Lot Development

M. Fine Lot Development

finished

Project Description

This project consisted of excavating and grading the existing topography to install a new parking lot. APC began by installing a compacted stone base for the new parking lot and the alley way behind the parking lot. An electrical conduit and concrete base for new lighting poles were installed, as well as drainage structures and drainage pipe. Some of the existing sidewalk was removed and replaced with new ADA compliant crosswalks. A concrete privacy wall with decorative limestone veneer was built along the perimeter of the lot facing Main Street. A wooden privacy fence was built along the remaining perimeter. APC installed an HMA Base course and HMA Surface course along with monolithic concrete curb and gutter around the lot. APC added signs and striping to complete construction of the lot.

Project Details

  • Client: New Albany Board of Public Works
  • Architect/Engineer: HMB Professional Engineers, Inc.
  • Builder/General Contractor: APC
  • Expected Start and Finish Dates: June – September 2018

Project Gallery

IMG_1285
IMG_1286
IMG_1287
IMG_1288
grade work
grade work 2
IMG_1609
IMG_1611
IMG_1613
IMG_1617
IMG_1616
IMG_1626
IMG_1625
IMG_1621
IMG_1632
IMG_1634
IMG_1639
IMG_1649
IMG_1652
IMG_1665
IMG_1677
IMG_1679
IMG_2121
IMG_1683
IMG_2126
IMG_2128
IMG_2141
IMG_2149
Read More
10Jul

Chadford Way, D.I.P

Chadford Way, Drainage Improvement Project

IMG_1303

Project Description

This project consists of earth regrading and building a concrete wall due to flooding issues. We also replaced the affected neighbors driveway and added stone and sod to complete the curb appeal after the job was completed.

Project Details

  • Client: MSD
  • Architect/Engineer: Trautwein Engineering
  • Builder/General Contractor: APC
  • Budget: $200,000
  • Expected Start and Finish Dates: March – May 2018

Project Gallery

IMG_6555
IMG_6556
IMG_6558
IMG_6561
IMG_6563
IMG_6564
IMG_6566
IMG_6592
IMG_6597
IMG_6593
IMG_6711
IMG_6719
IMG_1299
IMG_1301
IMG_1304
IMG_1302
IMG_1305
IMG_1303
IMG_1306
IMG_1307
Read More
1Nov

Woodside Drive, D.I.P

Woodside Drive, Culvert Replacement D.I.P

IMG_0732

Project Description

This project consists of removing the existing road and concrete bridge. We are installing a 10’ x 5’ precast concrete box culvert and pouring in place concrete wing-walls and footers. We will then proceed with replacing the road with new asphalt and a guardrail.

Project Details

  • Client: Louisville Metro Public Works
  • Architect/Engineer: QK4
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: November 1st – November 15th 2017

Project Gallery

IMG_0723
IMG_0728
IMG_0730
IMG_0731
IMG_0735
IMG_0739
IMG_0747
IMG_0776
IMG_0790
IMG_0819
IMG_0821
IMG_0828
IMG_0827
IMG_0848
IMG_0843
IMG_0836
IMG_1150
IMG_1153
IMG_1155
IMG_1164
Read More
1Nov

Russel Lee Park, Sidewalk Replacement

Russel Lee Park, Sidewalk Replacement

IMG_0712

Project Description

This project consists of excavating the existing walkways and replacing them with a newly stamped concrete walking path, bench pads and site furnishings.

Project Details

  • Client: Metro Parks & Recreation
  • Architect/Engineer: Metro Parks & Recreation
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: November 2nd – December 2nd, 2017

Project Gallery

IMG_0701
IMG_0707
IMG_0702
IMG_0703
IMG_0793
IMG_0799
IMG_0798
IMG_0804
IMG_1213
IMG_1214
IMG_1222
IMG_1216
IMG_1218
IMG_1219
IMG_1220
IMG_1221
Read More
21Jun

Tycoon Way, D.I.P

Tycoon Way, D.I.P

IMG_0313

Project Description

For this drainage improvement project we began with clearing and excavating the existing broken down drainage ditch to install a new 6” wide concrete paved ‘V’ ditch. We are currently in the process of installing a new 12’ tall RediRock modular retaining wall system to repair the bank of the south fork of Beargrass Creek adjacent to Trevilian Way.

Project Details

  • Client:Louisville Metropolitan Sewer District
  • Architect/Engineer: Louisville Metropolitan Sewer District
  • Builder/General Contractor: APC
  • Budget: $200,000
  • Expected Start and Finish Dates: May 2017 (Expected) July 2017

Project Gallery

20170522_ (3)
20170522_ (5)
20170522_ (8)
20170522_9
IMG_0313
IMG_0314
IMG_0315
IMG_0316
IMG_0317
IMG_0318
Read More
13Jun

Applegate Lane, D.I.P

Applegate Lane, D.I.P

20170608_143335

Project Description

The Town of Sellersburg had an emergency contract to replace a failing concrete drainage structure. For this drainage improvement project we began with excavating the existing breaking down roadway and old-style concrete culvert to install a brand new concrete box culvert. After excavating the site, we then regraded the drainage bank area to ensure proper water flow. The new culvert box is 10’ wide by 4’ tall and 60’ long. After placing the new culvert boxes we began to form and pour concrete wing walls on each end of the structure. We then added rip-rap stone base and paved a new roadway.

Project Details

  • Client: Town of Sellersburg
  • Architect/Engineer: Jacobi, Toombs & Lanz Inc.
  • Builder/General Contractor: APC
  • Budget: $120,000
  • Expected Start and Finish Dates: May 25th → June 13th 2017

Project Gallery

IMG_0321
IMG_6259
IMG_6261
IMG_0327
IMG_6268
IMG_0326
IMG_0322
IMG_0325
IMG_0329
20170608_143453
20170608_143413
20170608_143335
IMG_6373
IMG_6363
IMG_6369
IMG_6368
IMG_6386
IMG_6375
IMG_6385
IMG_6376
IMG_6388

Project Video

Read More
21May

Ground Effects LTD., New Parking Lot

Ground Effects LTD., New Parking Lot

Project Description

For this project APC was responsible for a full site development for Ford’s production lot of 10,000 square yards. We began with excavating the site and leveling out the ground. Once we had an even surface we placed and compressed the rip-rap stone base to prepare for asphalt paving. APC performed the asphalt paving and striping of the new lot as well.

Project Details

  • Client: Ground Effects LTD.
  • Architect/Engineer: APC
  • Builder/General Contractor: APC
  • Budget: $90,000
  • Expected Start and Finish Dates: November 2016 to December 2016

Project Gallery

IMG_1355 (1)
IMG_1357 - Copy (2)
IMG_1361 - Copy
IMG_1372
IMG_1375
IMG_1385
IMG_1389
IMG_1407
Read More