Wyandotte Park, Sport Court Improvements

Wyandotte Park, Sport Court Improvements

IMG_1447

Project Description

This project consisted of demolishing the existing tennis court to replace it with a new futsal court, pickle ball courts and a tennis court. The existing lighting was removed and we installed new lighting for the new courts and the basketball court.  Allterrain regraded multiple areas within the park to improve storm drainage and installed new storm structures and a drain pipe. Allterrain also repaved majority of the existing walking paths within the park.

Project Details

  • Client: Louisville Jefferson County Metro Government/Metro Parks
  • Architect/Engineer: Louisville Jefferson County Metro Government/Metro Parks
  • Builder/General Contractor: Allterrain Paving & Construction (APC)
  • Budget: $303,000
  • Expected Start and Finish Dates: April – July 2018

Project Gallery

IMG_0901
IMG_0903
IMG_0904
IMG_0921
IMG_0906
IMG_0915
IMG_0910
IMG_0912
IMG_1173
IMG_0919
IMG_0922
IMG_1353
IMG_1169
IMG_0995
IMG_0986
IMG_2819
IMG_1176
IMG_1198
IMG_1201
IMG_7042
IMG_1347
IMG_1351
IMG_1349
IMG_1352
IMG_1476
IMG_1477
IMG_1470
IMG_1468
IMG_1472
IMG_1469
IMG_1457
IMG_1478
IMG_1467
IMG_1466
IMG_1461
IMG_1463
IMG_1447
IMG_1449
IMG_1444
IMG_1441
IMG_1452
IMG_1455
IMG_1443
IMG_1442
Read More
10Jul

Chadford Way, D.I.P

Chadford Way, Drainage Improvement Project

IMG_1303

Project Description

This project consists of earth regrading and building a concrete wall due to flooding issues. We also replaced the affected neighbors driveway and added stone and sod to complete the curb appeal after the job was completed.

Project Details

  • Client: MSD
  • Architect/Engineer: Trautwein Engineering
  • Builder/General Contractor: APC
  • Budget: $200,000
  • Expected Start and Finish Dates: March – May 2018

Project Gallery

IMG_6555
IMG_6556
IMG_6558
IMG_6561
IMG_6563
IMG_6564
IMG_6566
IMG_6592
IMG_6597
IMG_6593
IMG_6711
IMG_6719
IMG_1299
IMG_1301
IMG_1304
IMG_1302
IMG_1305
IMG_1303
IMG_1306
IMG_1307
Read More
1Nov

Woodside Drive, D.I.P

Woodside Drive, Culvert Replacement D.I.P

IMG_0732

Project Description

This project consists of removing the existing road and concrete bridge. We are installing a 10’ x 5’ precast concrete box culvert and pouring in place concrete wing-walls and footers. We will then proceed with replacing the road with new asphalt and a guardrail.

Project Details

  • Client: Louisville Metro Public Works
  • Architect/Engineer: QK4
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: November 1st – November 15th 2017

Project Gallery

IMG_0723
IMG_0728
IMG_0730
IMG_0731
IMG_0735
IMG_0739
IMG_0747
IMG_0776
IMG_0790
IMG_0819
IMG_0821
IMG_0828
IMG_0827
IMG_0848
IMG_0843
IMG_0836
IMG_1150
IMG_1153
IMG_1155
IMG_1164
Read More
21Jun

Tycoon Way, D.I.P

Tycoon Way, D.I.P

IMG_0313

Project Description

For this drainage improvement project we began with clearing and excavating the existing broken down drainage ditch to install a new 6” wide concrete paved ‘V’ ditch. We are currently in the process of installing a new 12’ tall RediRock modular retaining wall system to repair the bank of the south fork of Beargrass Creek adjacent to Trevilian Way.

Project Details

  • Client:Louisville Metropolitan Sewer District
  • Architect/Engineer: Louisville Metropolitan Sewer District
  • Builder/General Contractor: APC
  • Budget: $200,000
  • Expected Start and Finish Dates: May 2017 (Expected) July 2017

Project Gallery

20170522_ (3)
20170522_ (5)
20170522_ (8)
20170522_9
IMG_0313
IMG_0314
IMG_0315
IMG_0316
IMG_0317
IMG_0318
Read More
20Jun

Autumn Grove, Concrete Work & D.I.P

Autumn Grove, Concrete Work & D.I.P

IMG_6214

Project Description

For this new subdivision we have done all concrete work including driveways, walkways, sidewalks, stairs, curbs and gutters, and drain pans. We created a detention base to collect and properly drain overflow storm water. All of the roadways have been base paved by usand we will finish the paving process once all other construction on-site has finished, ensuring a long-lasting roadway.

Project Details

  • Client: Neace Ventures
  • Architect/Engineer: John G. Brinkworth
  • Builder/General Contractor: Neace Ventures
  • Budget: $250,000
  • Expected Start and Finish Dates: 2014  (Expected) Fall of 2018

Project Gallery

Automn Grove- Detention Base
IMG_6211
IMG_6212
IMG_6213
Read More
13Jun

Applegate Lane, D.I.P

Applegate Lane, D.I.P

20170608_143335

Project Description

The Town of Sellersburg had an emergency contract to replace a failing concrete drainage structure. For this drainage improvement project we began with excavating the existing breaking down roadway and old-style concrete culvert to install a brand new concrete box culvert. After excavating the site, we then regraded the drainage bank area to ensure proper water flow. The new culvert box is 10’ wide by 4’ tall and 60’ long. After placing the new culvert boxes we began to form and pour concrete wing walls on each end of the structure. We then added rip-rap stone base and paved a new roadway.

Project Details

  • Client: Town of Sellersburg
  • Architect/Engineer: Jacobi, Toombs & Lanz Inc.
  • Builder/General Contractor: APC
  • Budget: $120,000
  • Expected Start and Finish Dates: May 25th → June 13th 2017

Project Gallery

IMG_0321
IMG_6259
IMG_6261
IMG_0327
IMG_6268
IMG_0326
IMG_0322
IMG_0325
IMG_0329
20170608_143453
20170608_143413
20170608_143335
IMG_6373
IMG_6363
IMG_6369
IMG_6368
IMG_6386
IMG_6375
IMG_6385
IMG_6376
IMG_6388

Project Video

Read More