For this project, we began with a full mill and overlay of the existing asphalt pavement. This road was approximately 1600’ long and 35’ wide. This project involved a significant amount of leveling and wedging to improve the drainage and reliability of roadways. Within 3 days we completed the paving operations on both sides of the roadway.