Wesley Chapel, Seal-coat/Striping

PROJECT DESCRIPTION

This project consisted of prepping the existing asphalt to apply rubber crack sealant to cracks throughout the parking lot and drive. APC then applied a seal coating to the entire parking lot and drive and re-striped the entire parking lot and drive to the original design. APC installed a 6″ PVC French drain wrapped in Geo-textile fabric to eliminate drainage issues in the SE corner in the rear of the parking lot; as well as repair the existing asphalt in this area.

PROJECT DETAILS
  • Client: Wesley Chapel
  • Architect/Engineer:
  • Builder/General Contractor: Allterrain Paving & Construction (APC)
  • Budget: N/A
  • Expected Start and Finish Dates: July 16 – July 26, 2018
IMG_1504
PROJECT GALLERY