M. Fine Lot Development

PROJECT DESCRIPTION

This project consisted of excavating and grading the existing topography to install a new parking lot. APC began by installing a compacted stone base for the new parking lot and the alley way behind the parking lot. An electrical conduit and concrete base for new lighting poles were installed, as well as drainage structures and drainage pipes. Some of the existing sidewalk was removed and replaced with new ADA compliant crosswalks. A concrete privacy wall with decorative limestone veneer was built along the perimeter of the lot facing Main Street. A wooden privacy fence was built along the remaining perimeter. APC installed an HMA Base course and HMA Surface course along with a monolithic concrete curb and gutter around the lot. APC added signs and striping to complete the construction of the lot.

PROJECT DETAILS
  • Client: New Albany Board of Public Works
  • Architect/Engineer: HMB Professional Engineers, Inc.
  • Builder/General Contractor: APC
  • Expected Start and Finish Dates: June – September 2018
finished-595x480
PROJECT GALLERY
Read more

Hopkins Lane, Sidewalk & D.I.P

HOPKINS LANE SIDEWALK INSTALLATION AND STORM DRAINAGE IMPROVMENTS
PROJECT DESCRIPTION

This project consists of furnishing and installing approximately 3,900’ of 5’ wide concrete sidewalk, curb ramps, concrete driveway aprons, selective paving, striping, storm, and sanitary sewers.

PROJECT DETAILS
  • Client: City of Jeffersonville
  • Architect/Engineer: Jacobi, Toombs &Lanz Inc.
  • Builder/General Contractor: APC
  • Budget: $315,000
  • Expected Start and Finish Dates: June 2017 to August 2017
IMG_6391
PROJECT GALLERY
Read more

Autumn Grove, Concrete Work & D.I.P

PROJECT DESCRIPTION

For this new subdivision, we have done all concrete work including driveways, walkways, sidewalks, stairs, curbs, gutters, and drain pans. We created a detention base to collect and properly drain overflow stormwater. All of the roadways have been base paved by us and we will finish the paving process once all other construction on-site has finished, ensuring a long-lasting roadway.

PROJECT DETAILS
  • Client: Neace Ventures
  • Architect/Engineer: John G. Brinkworth
  • Builder/General Contractor: Neace Ventures
  • Budget: $250,000
  • Expected Start and Finish Dates: 2014  (Expected) Fall of 2018
IMG_6214-e1498194965929
PROJECT GALLERY
Read more

LG&E Restoration Contract

PROJECT DESCRIPTION

APC is responsible for repairing the disturbed areas of all roadways, concrete street pads and sidewalks where LG&E has completed the renewal of gas pipe work. This restoration contract that LG&E is performing takes place within the downtown metro area of Louisville, KY. So far, APC has completed 13 projects for this contract.

PROJECT DETAILS
  • Client: LG&E
  • Architect/Engineer: David McQuire and Debra Davis from LG&E
  • Builder/General Contractor: APC
  • Budget: Unit Price Contract
  • Expected Start and Finish Dates: Contract finishes in April 2021
20161031_090405_resized_1
PROJECT GALLERY
Read more