Russel Lee Park, Sidewalk Replacement

PROJECT DESCRIPTION

This project consists of excavating the existing walkways and replacing them with a newly stamped concrete walking path, bench pads, and site furnishings.

PROJECT DETAILS
  • Client: Metro Parks & Recreation
  • Architect/Engineer: Metro Parks & Recreation
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: November 2nd – December 2nd, 2017
IMG_0712
PROJECT GALLERY
Read more

Hopkins Lane, Sidewalk & D.I.P

HOPKINS LANE SIDEWALK INSTALLATION AND STORM DRAINAGE IMPROVMENTS
PROJECT DESCRIPTION

This project consists of furnishing and installing approximately 3,900’ of 5’ wide concrete sidewalk, curb ramps, concrete driveway aprons, selective paving, striping, storm, and sanitary sewers.

PROJECT DETAILS
  • Client: City of Jeffersonville
  • Architect/Engineer: Jacobi, Toombs &Lanz Inc.
  • Builder/General Contractor: APC
  • Budget: $315,000
  • Expected Start and Finish Dates: June 2017 to August 2017
IMG_6391
PROJECT GALLERY
Read more

C2 Event Center, Site Demo & Lot Remodel

PROJECT DESCRIPTION

For this project, we performed selective construction and site demo for a new building/event center. The project consisted of sitegrading for building pad, installing irrigation sleeves, sidewalks, curbs, curb ramps, driveway/entrance, wheel stops, signage, asphalt parking lot repairs, sealcoat, and striping.

PROJECT DETAILS
  • Client: Kelley Construction
  • Architect/Engineer:
  • Builder/General Contractor: Kelley Construction (General contractor) APC (Subcontractor)
  • Budget: $176,000
  • Expected Start and Finish Dates: April 2016 to June 2017
IMG_6362-2
PROJECT GALLERY
Read more

Chestnut Street, Streetscape

PROJECT DESCRIPTION

This project included milling and repaving the existing asphalt pavement. We also removed and replaced the concrete sidewalks to redesign the street corner at Chestnut St and Wall St. We then created a curbed bump-out that swells out into the road to form a defined parking area for the nearby residents. This streetscape really enhanced the aesthetic and created a safe area for pedestrians and parked cars.

PROJECT DETAILS
  • Client: City of Jeffersonville
  • Architect/Engineer: City of Jeffersonville
  • Builder/General Contractor: APC
  • Budget: $45,000
  • Expected Start and Finish Dates: April 2017 to June 2017
Chestnut-St-Streetscape6-e1498117093454
PROJECT GALLERY
Read more

Autumn Grove, Concrete Work & D.I.P

PROJECT DESCRIPTION

For this new subdivision, we have done all concrete work including driveways, walkways, sidewalks, stairs, curbs, gutters, and drain pans. We created a detention base to collect and properly drain overflow stormwater. All of the roadways have been base paved by us and we will finish the paving process once all other construction on-site has finished, ensuring a long-lasting roadway.

PROJECT DETAILS
  • Client: Neace Ventures
  • Architect/Engineer: John G. Brinkworth
  • Builder/General Contractor: Neace Ventures
  • Budget: $250,000
  • Expected Start and Finish Dates: 2014  (Expected) Fall of 2018
IMG_6214-e1498194965929
PROJECT GALLERY
Read more