PROJECT DESCRIPTION
This project consisted of prepping the existing asphalt to apply rubber crack sealant to cracks throughout the parking lot and drive. APC then applied a seal coating to the entire parking lot and drive and re-striped the entire parking lot and drive to the original design. APC installed a 6″ PVC French drain wrapped in Geo-textile fabric to eliminate drainage issues in the SE corner in the rear of the parking lot; as well as repair the existing asphalt in this area.
PROJECT DETAILS
- Client: Wesley Chapel
- Architect/Engineer:
- Builder/General Contractor: Allterrain Paving & Construction (APC)
- Budget: N/A
- Expected Start and Finish Dates: July 16 – July 26, 2018