Wesley Chapel, Seal-coat/Striping

PROJECT DESCRIPTION

This project consisted of prepping the existing asphalt to apply rubber crack sealant to cracks throughout the parking lot and drive. APC then applied a seal coating to the entire parking lot and drive and re-striped the entire parking lot and drive to the original design. APC installed a 6″ PVC French drain wrapped in Geo-textile fabric to eliminate drainage issues in the SE corner in the rear of the parking lot; as well as repair the existing asphalt in this area.

PROJECT DETAILS
  • Client: Wesley Chapel
  • Architect/Engineer:
  • Builder/General Contractor: Allterrain Paving & Construction (APC)
  • Budget: N/A
  • Expected Start and Finish Dates: July 16 – July 26, 2018
IMG_1504
PROJECT GALLERY
Read more

Progress Way, Asphalt Pavement Repair

PROJECT DESCRIPTION

For this project, we were sent in to fix the uneven and rough transition concerning where the roadway and the bridge meet. This transition had sunken over time which caused the roadway to be uncomfortable and unsafe for drivers. We were able to complete repairs on both ends of the bridge in 1 day causing minimal disruption to traffic flow on this busy roadway. For this project we used our Infrared Asphalt Recycler Machine, therefore there was no need for milling. With this technology, we heated the existing asphalt back up to factory standards, and then we add rejuvenating oil, which brought the asphalt back to life. At this point, we were able to rake the asphalt to properly distribute it, and at that time the asphalt is rolled and sealed to create a smooth and long-lasting surface.

PROJECT DETAILS
  • Client: Town of Clarksville
  • Architect/Engineer: Bradley Cummings- Public Works Director
  • Builder/General Contractor: APC
  • Budget: $5000
  • Expected Start and Finish Dates:Started & Completed on June 1st2017
IMG_6157-1
PROJECT GALLERY
Read more