M. Fine Lot Development

PROJECT DESCRIPTION

This project consisted of excavating and grading the existing topography to install a new parking lot. APC began by installing a compacted stone base for the new parking lot and the alley way behind the parking lot. An electrical conduit and concrete base for new lighting poles were installed, as well as drainage structures and drainage pipes. Some of the existing sidewalk was removed and replaced with new ADA compliant crosswalks. A concrete privacy wall with decorative limestone veneer was built along the perimeter of the lot facing Main Street. A wooden privacy fence was built along the remaining perimeter. APC installed an HMA Base course and HMA Surface course along with a monolithic concrete curb and gutter around the lot. APC added signs and striping to complete the construction of the lot.

PROJECT DETAILS
  • Client: New Albany Board of Public Works
  • Architect/Engineer: HMB Professional Engineers, Inc.
  • Builder/General Contractor: APC
  • Expected Start and Finish Dates: June – September 2018
finished-595x480
PROJECT GALLERY
Read more

Wyandotte Park, Sport Court Improvements

PROJECT DESCRIPTION

This project consisted of demolishing the existing tennis court to replace it with a new futsal court, pickleball courts, and a tennis court. The existing lighting was removed and we installed new lighting for the new courts and the basketball court. Allterrain regraded multiple areas within the park to improve storm drainage and installed new storm structures and a drain pipe. Allterrain also repaved the majority of the existing walking paths within the park.

PROJECT DETAILS
  • Client: Louisville Jefferson County Metro Government/Metro Parks
  • Architect/Engineer: Louisville Jefferson County Metro Government/Metro Parks
  • Builder/General Contractor: Allterrain Paving & Construction (APC)
  • Budget: $303,000
  • Expected Start and Finish Dates: April – July 2018
IMG_1447
PROJECT GALLERY
Read more

Chadford Way, D.I.P

CHADFORD WAY, DRAINAGE IMPROVEMENT PROJECT
PROJECT DESCRIPTION

This project consists of earth regrading and building a concrete wall due to flooding issues. We also replaced the affected neighbors’ driveway and added stone and sod to complete the curb appeal after the job was completed.

PROJECT DETAILS
  • Client: MSD
  • Architect/Engineer: Trautwein Engineering
  • Builder/General Contractor: APC
  • Budget: $200,000
  • Expected Start and Finish Dates: March – May 2018
IMG_1303
PROJECT GALLERY
Read more

Tycoon Way, D.I.P

PROJECT DESCRIPTION

For this drainage improvement project, we began with clearing and excavating the existing broken down drainage ditch to install a new 6” wide concrete paved ‘V’ ditch. We are currently in the process of installing a new 12’ tall RediRock modular retaining wall system to repair the bank of the south fork of Beargrass Creek adjacent to Trevilian Way.

PROJECT DETAILS
  • Client:Louisville Metropolitan Sewer District
  • Architect/Engineer: Louisville Metropolitan Sewer District
  • Builder/General Contractor: APC
  • Budget: $200,000
  • Expected Start and Finish Dates: May 2017 (Expected) July 2017
IMG_0313-e1498194427310
PROJECT GALLERY
Read more

Applegate Lane, D.I.P

PROJECT DESCRIPTION

The Town of Sellersburg had an emergency contract to replace a failing concrete drainage structure. For this drainage improvement project, we began with excavating the existing breaking down the roadway and old-style concrete culvert to install a brand new concrete box culvert. After excavating the site, we then regraded the drainage bank area to ensure proper water flow. The new culvert box is 10’ wide by 4’ tall and 60’ long. After placing the new culvert boxes we began to form and pour concrete wing walls on each end of the structure. We then added a rip-rap stone base and paved a new roadway.

PROJECT DETAILS
  • Client: Town of Sellersburg
  • Architect/Engineer: Jacobi, Toombs & Lanz Inc.
  • Builder/General Contractor: APC
  • Budget: $120,000
  • Expected Start and Finish Dates: May 25th → June 13th 2017
20170608_143335
PROJECT GALLERY
Read more

Premier Homes, Domestic Water Main Installation

PROJECT DESCRIPTION

For this project, we installed new domestic water lines with individual property service connections for new subdivision development in Louisville, KY.

PROJECT DETAILS
  • Client: Premier Homes
  • Architect/Engineer: Louisville Water Company
  • Builder/General Contractor: APC
  • Budget: $25,000
  • Expected Start and Finish Dates: Completed Dec 2016
premier-homes-1
PROJECT GALLERY
Read more