M. Fine Lot Development

PROJECT DESCRIPTION

This project consisted of excavating and grading the existing topography to install a new parking lot. APC began by installing a compacted stone base for the new parking lot and the alley way behind the parking lot. An electrical conduit and concrete base for new lighting poles were installed, as well as drainage structures and drainage pipes. Some of the existing sidewalk was removed and replaced with new ADA compliant crosswalks. A concrete privacy wall with decorative limestone veneer was built along the perimeter of the lot facing Main Street. A wooden privacy fence was built along the remaining perimeter. APC installed an HMA Base course and HMA Surface course along with a monolithic concrete curb and gutter around the lot. APC added signs and striping to complete the construction of the lot.

PROJECT DETAILS
  • Client: New Albany Board of Public Works
  • Architect/Engineer: HMB Professional Engineers, Inc.
  • Builder/General Contractor: APC
  • Expected Start and Finish Dates: June – September 2018
finished-595x480
PROJECT GALLERY
Read more

N.A Plaza, Concrete/Asphalt/Striping

NEW ALBANY PLAZA, CONCRETE CURBS/PAVING/STRIPING
PROJECT DESCRIPTION

This project consists of milling the vast majority of the parking lot to install new concrete curbs and pour new asphalt. We also striped all new asphalt and painted traffic control and handicap symbols.

PROJECT DETAILS
  • Client: Kroger
  • Architect/Engineer: Heritage Engineering
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: June 22nd 2017 to July 14th 2017
IMG_0217-1
PROJECT GALLERY
Read more

C2 Event Center, Site Demo & Lot Remodel

PROJECT DESCRIPTION

For this project, we performed selective construction and site demo for a new building/event center. The project consisted of sitegrading for building pad, installing irrigation sleeves, sidewalks, curbs, curb ramps, driveway/entrance, wheel stops, signage, asphalt parking lot repairs, sealcoat, and striping.

PROJECT DETAILS
  • Client: Kelley Construction
  • Architect/Engineer:
  • Builder/General Contractor: Kelley Construction (General contractor) APC (Subcontractor)
  • Budget: $176,000
  • Expected Start and Finish Dates: April 2016 to June 2017
IMG_6362-2
PROJECT GALLERY
Read more

Chestnut Street, Streetscape

PROJECT DESCRIPTION

This project included milling and repaving the existing asphalt pavement. We also removed and replaced the concrete sidewalks to redesign the street corner at Chestnut St and Wall St. We then created a curbed bump-out that swells out into the road to form a defined parking area for the nearby residents. This streetscape really enhanced the aesthetic and created a safe area for pedestrians and parked cars.

PROJECT DETAILS
  • Client: City of Jeffersonville
  • Architect/Engineer: City of Jeffersonville
  • Builder/General Contractor: APC
  • Budget: $45,000
  • Expected Start and Finish Dates: April 2017 to June 2017
Chestnut-St-Streetscape6-e1498117093454
PROJECT GALLERY
Read more