M. Fine Lot Development

PROJECT DESCRIPTION

This project consisted of excavating and grading the existing topography to install a new parking lot. APC began by installing a compacted stone base for the new parking lot and the alley way behind the parking lot. An electrical conduit and concrete base for new lighting poles were installed, as well as drainage structures and drainage pipes. Some of the existing sidewalk was removed and replaced with new ADA compliant crosswalks. A concrete privacy wall with decorative limestone veneer was built along the perimeter of the lot facing Main Street. A wooden privacy fence was built along the remaining perimeter. APC installed an HMA Base course and HMA Surface course along with a monolithic concrete curb and gutter around the lot. APC added signs and striping to complete the construction of the lot.

PROJECT DETAILS
  • Client: New Albany Board of Public Works
  • Architect/Engineer: HMB Professional Engineers, Inc.
  • Builder/General Contractor: APC
  • Expected Start and Finish Dates: June – September 2018
finished-595x480
PROJECT GALLERY
Read more

Wesley Chapel, Seal-coat/Striping

PROJECT DESCRIPTION

This project consisted of prepping the existing asphalt to apply rubber crack sealant to cracks throughout the parking lot and drive. APC then applied a seal coating to the entire parking lot and drive and re-striped the entire parking lot and drive to the original design. APC installed a 6″ PVC French drain wrapped in Geo-textile fabric to eliminate drainage issues in the SE corner in the rear of the parking lot; as well as repair the existing asphalt in this area.

PROJECT DETAILS
  • Client: Wesley Chapel
  • Architect/Engineer:
  • Builder/General Contractor: Allterrain Paving & Construction (APC)
  • Budget: N/A
  • Expected Start and Finish Dates: July 16 – July 26, 2018
IMG_1504
PROJECT GALLERY
Read more

Vincennes St, Thermoplastic Striping

PROJECT DESCRIPTION

This project consists of thermoplastic striping and road markings along Vincennes St from Main St to Charlestown Rd. We striped all new asphalt including traffic symbols, parking spots, crosswalks, and bike lanes.

PROJECT DETAILS
  • Client: City of New Albany
  • Architect/Engineer: Clark Dietz Inc, Wes Christmas
  • Builder/General Contractor: MAC Construction & Excavating Inc
  • Budget: N/A
  • Expected Start and Finish Dates: July 11 2017 – August 31 2017
IMG_0246
PROJECT GALLERY
Read more

C2 Event Center, Site Demo & Lot Remodel

PROJECT DESCRIPTION

For this project, we performed selective construction and site demo for a new building/event center. The project consisted of sitegrading for building pad, installing irrigation sleeves, sidewalks, curbs, curb ramps, driveway/entrance, wheel stops, signage, asphalt parking lot repairs, sealcoat, and striping.

PROJECT DETAILS
  • Client: Kelley Construction
  • Architect/Engineer:
  • Builder/General Contractor: Kelley Construction (General contractor) APC (Subcontractor)
  • Budget: $176,000
  • Expected Start and Finish Dates: April 2016 to June 2017