North Harrison Community Schools – Repave, Seal Coat, Stripe

PROJECT DESCRIPTION

This project included mass excavation/grading, base rock installation and grading, paving, and striping for the new parking lot in front of the new building addition. The project also included asphalt re-surfacing of the North Harrison campus primary roadway. Demolition of the existing concrete island near the North Harrison Middle School entrance. Crack filling, seal coating, and re-striping of all parking lots as well as the ball field path at the North Harrison campus. Crack filling, seal coating of all three lots at Morgan Elementary.

PROJECT DETAILS
  • Client: North Harrison Community Schools
  • Architect/Engineer: Kovert Hawkins Architects, Inc.
  • Construction Manager: James L. Shireman, Inc.
  • Builder/General Contractor: APC
  • Budget: $337,700
  • Expected Start and Finish Dates: July – November 2018
IMG_1577
PROJECT GALLERY
Read more

Progress Way, Asphalt Pavement Repair

PROJECT DESCRIPTION

For this project, we were sent in to fix the uneven and rough transition concerning where the roadway and the bridge meet. This transition had sunken over time which caused the roadway to be uncomfortable and unsafe for drivers. We were able to complete repairs on both ends of the bridge in 1 day causing minimal disruption to traffic flow on this busy roadway. For this project we used our Infrared Asphalt Recycler Machine, therefore there was no need for milling. With this technology, we heated the existing asphalt back up to factory standards, and then we add rejuvenating oil, which brought the asphalt back to life. At this point, we were able to rake the asphalt to properly distribute it, and at that time the asphalt is rolled and sealed to create a smooth and long-lasting surface.

PROJECT DETAILS
  • Client: Town of Clarksville
  • Architect/Engineer: Bradley Cummings- Public Works Director
  • Builder/General Contractor: APC
  • Budget: $5000
  • Expected Start and Finish Dates:Started & Completed on June 1st2017
IMG_6157-1
PROJECT GALLERY
Read more

LG&E Restoration Contract

PROJECT DESCRIPTION

APC is responsible for repairing the disturbed areas of all roadways, concrete street pads and sidewalks where LG&E has completed the renewal of gas pipe work. This restoration contract that LG&E is performing takes place within the downtown metro area of Louisville, KY. So far, APC has completed 13 projects for this contract.

PROJECT DETAILS
  • Client: LG&E
  • Architect/Engineer: David McQuire and Debra Davis from LG&E
  • Builder/General Contractor: APC
  • Budget: Unit Price Contract
  • Expected Start and Finish Dates: Contract finishes in April 2021