Wyandotte Park, Sport Court Improvements

PROJECT DESCRIPTION

This project consisted of demolishing the existing tennis court to replace it with a new futsal court, pickleball courts, and a tennis court. The existing lighting was removed and we installed new lighting for the new courts and the basketball court. Allterrain regraded multiple areas within the park to improve storm drainage and installed new storm structures and a drain pipe. Allterrain also repaved the majority of the existing walking paths within the park.

PROJECT DETAILS
  • Client: Louisville Jefferson County Metro Government/Metro Parks
  • Architect/Engineer: Louisville Jefferson County Metro Government/Metro Parks
  • Builder/General Contractor: Allterrain Paving & Construction (APC)
  • Budget: $303,000
  • Expected Start and Finish Dates: April – July 2018
IMG_1447
PROJECT GALLERY
Read more

Chadford Way, D.I.P

CHADFORD WAY, DRAINAGE IMPROVEMENT PROJECT
PROJECT DESCRIPTION

This project consists of earth regrading and building a concrete wall due to flooding issues. We also replaced the affected neighbors’ driveway and added stone and sod to complete the curb appeal after the job was completed.

PROJECT DETAILS
  • Client: MSD
  • Architect/Engineer: Trautwein Engineering
  • Builder/General Contractor: APC
  • Budget: $200,000
  • Expected Start and Finish Dates: March – May 2018
IMG_1303
PROJECT GALLERY
Read more

Woodside Drive, D.I.P

WOODSIDE DRIVE, CULVERT REPLACEMENT D.I.P
PROJECT DESCRIPTION

This project consists of removing the existing road and concrete bridge. We are installing a 10’ x 5’ precast concrete box culvert and pouring in place concrete wing walls and footers. We will then proceed with replacing the road with new asphalt and a guardrail.

PROJECT DETAILS
  • Client: Louisville Metro Public Works
  • Architect/Engineer: QK4
  • Builder/General Contractor: APC
  • Budget: N/A
  • Expected Start and Finish Dates: November 1st – November 15th 2017
IMG_0732
PROJECT GALLERY
Read more

Tycoon Way, D.I.P

PROJECT DESCRIPTION

For this drainage improvement project, we began with clearing and excavating the existing broken down drainage ditch to install a new 6” wide concrete paved ‘V’ ditch. We are currently in the process of installing a new 12’ tall RediRock modular retaining wall system to repair the bank of the south fork of Beargrass Creek adjacent to Trevilian Way.

PROJECT DETAILS
  • Client:Louisville Metropolitan Sewer District
  • Architect/Engineer: Louisville Metropolitan Sewer District
  • Builder/General Contractor: APC
  • Budget: $200,000
  • Expected Start and Finish Dates: May 2017 (Expected) July 2017
IMG_0313-e1498194427310
PROJECT GALLERY
Read more

Autumn Grove, Concrete Work & D.I.P

PROJECT DESCRIPTION

For this new subdivision, we have done all concrete work including driveways, walkways, sidewalks, stairs, curbs, gutters, and drain pans. We created a detention base to collect and properly drain overflow stormwater. All of the roadways have been base paved by us and we will finish the paving process once all other construction on-site has finished, ensuring a long-lasting roadway.

PROJECT DETAILS
  • Client: Neace Ventures
  • Architect/Engineer: John G. Brinkworth
  • Builder/General Contractor: Neace Ventures
  • Budget: $250,000
  • Expected Start and Finish Dates: 2014  (Expected) Fall of 2018
IMG_6214-e1498194965929
PROJECT GALLERY
Read more

Applegate Lane, D.I.P

PROJECT DESCRIPTION

The Town of Sellersburg had an emergency contract to replace a failing concrete drainage structure. For this drainage improvement project, we began with excavating the existing breaking down the roadway and old-style concrete culvert to install a brand new concrete box culvert. After excavating the site, we then regraded the drainage bank area to ensure proper water flow. The new culvert box is 10’ wide by 4’ tall and 60’ long. After placing the new culvert boxes we began to form and pour concrete wing walls on each end of the structure. We then added a rip-rap stone base and paved a new roadway.

PROJECT DETAILS
  • Client: Town of Sellersburg
  • Architect/Engineer: Jacobi, Toombs & Lanz Inc.
  • Builder/General Contractor: APC
  • Budget: $120,000
  • Expected Start and Finish Dates: May 25th → June 13th 2017
20170608_143335
PROJECT GALLERY
Read more