The Town of Sellersburg had an emergency contract to replace a failing concrete drainage structure. For this drainage improvement project we began with excavating the existing breaking down roadway and old-style concrete culvert to install a brand new concrete box culvert. After excavating the site, we then regraded the drainage bank area to ensure proper water flow. The new culvert box is 10’ wide by 4’ tall and 60’ long. After placing the new culvert boxes we began to form and pour concrete wing walls on each end of the structure. We then added rip-rap stone base and paved a new roadway.

Project Details

  • Client: Town of Sellersburg
  • Architect/Engineer: Jacobi, Toombs & Lanz Inc.
  • Builder/General Contractor: APC
  • Budget: $120,000
  • Expected Start and Finish Dates: May 25th → June 13th 2017

Project Gallery

IMG_0321
IMG_6259
IMG_6261
IMG_0327
IMG_6268
IMG_0326
IMG_0322
IMG_0325
IMG_0329
20170608_143453
20170608_143413
20170608_143335
IMG_6373
IMG_6363
IMG_6369
IMG_6368
IMG_6386
IMG_6375
IMG_6385
IMG_6376
IMG_6388

Project Video