PROJECT DESCRIPTION
For this new subdivision, we have done all concrete work including driveways, walkways, sidewalks, stairs, curbs, gutters, and drain pans. We created a detention base to collect and properly drain overflow stormwater. All of the roadways have been base paved by us and we will finish the paving process once all other construction on-site has finished, ensuring a long-lasting roadway.
PROJECT DETAILS
- Client: Neace Ventures
- Architect/Engineer: John G. Brinkworth
- Builder/General Contractor: Neace Ventures
- Budget: $250,000
- Expected Start and Finish Dates: 2014 (Expected) Fall of 2018